Studzienki

Sand trap chambers

Supplying strong, flexible and durable products results in a long service life which in turn produces savings in the form of lower maintenance and renovation costs. The implementation of the unique Weholite pipe technology combined with the factory-made welded joints of particular components of manholes and chambers ensures their high quality and water-tightness. The dualwall technology guarantees maximum resistance to mechanical damage, which – in consequence – improves safety of installation and operation. Due to small weight the Weho manholes and chambers are easy to transport, unload and install. They are delivered directly to the construction site as a final and complete unit with the factory-made connections, which helps save assembly time and – in consequence – reduces the costs of installation and guarantees exceptional operational durability. All manholes and chambers have got technical approvals ITB and IBDiM and are officially approved by the Central Mining Institute to be used in mining damage areas.


Our assortment includes:

  • sand trap chambers
  • street inlet
  • inspection chambers
  • inspection manholes
  • customised chambers